NYISE Cupula
 

 Serving Students with Special Needs since 1831

 
  
 
 
 
 

 

NYISE Photo Blog


The Building of the New Playground


View of the old playground after it was destroy.

The Big Toys Playground served us well for many years, but it was time for something different.

A view of the destroyed Big Toys playground. The new gym is visible in the background.

It took a very short time to take down the old.

Workmen with a small tractor digging up the old playgound.

Early view of the construction of the new playground. Bright red poles rise up to the sky.

Rising out of the rubble comes a new vision
of what a playground should look like.

View of the finished tower and ramps of the new playground.

A broad committee planned for what will be
a terrific benefit to the children.

Wide view of the new playgound. Van Cleve Hall is visible in the background.

Special thanks should go to Erin, Noreen and
Dr. Burgett for all their extra time
and efforts to get the job done.

TOP OF PAGE


 

 
 
     
For our Annual Report and information on making a tax-deductible contribution contact:

The New York Institute for Special Education
Kim Benisatto, Operations Manager

999 Pelham Parkway Bronx, New York 10469 USA
Phone: (718) 519-7000 Ext. 315 Fax: (718) 231-9314